• Working Hours - Mon - Fri: 9:00 - 17:30

HVAC Projects

Chowgule Ship Building Division

  • Client

    Chowgule Group

  • Completed Year

    July 2025

  • Location

    Goa

  • Category

    Air Conditioning System

An air conditioning system will be designed and installed for the factory shed to ensure precise temperature control. This is essential to maintain optimal environmental conditions required for precision aluminum welding during the manufacturing process.

Leopard Valley

  • Client

    Leopard Valley

  • Completed Year

    May 2025

  • Location

    Canacona, Goa

  • Category

    Centralise Air Conditioning

Air Wing Engineering proudly executed the complete centralized air conditioning system for Leopard Valley, one of Goa’s most iconic clubs, known for its vibrant nightlife and high-energy event

Thalassa (Mopa Airport)

  • Client

    Thalassa

  • Completed Year

    August 2024

  • Location

    Mopa Airport, Goa

  • Category

    Centralized Air Conditioning System

Air Wing Engineering is proud to be associated with the renowned Thalassa brand, having executed the centralized air conditioning system for their new outlet, Thalassa Express, at Mopa Airport, Goa.

Chances Casinos

  • Client

    Chances Casinos

  • Completed Year

    2018

  • Location

    Goa

  • Category

    Centralized Air Conditioning System

Air Wing Engineering re-designed and re-constructed the centralized air conditioning system for the casino and coffee shop, effectively resolving previous issues of uneven cooling and significantly enhancing overall comfort and efficiency at chances casinos.

Club Mahindra Emrald Palms Resort

  • Client

    Club Mahindra

  • Completed Year

    September 2017

  • Location

    Varca, Goa

  • Category

    Replacing Cooling Tower Pipeline

Air Wing Engineering successfully carried out a key upgrade at Club Mahindra Emerald Palms by replacing the entire cooling tower pipeline, located on the terrace— which was a challenging task

Big Daddy – Casino Cruise Ship HVAC Overhaul

  • Client

    Big Daddy Casino

  • Completed Year

    September 2023

  • Location

    Goa

  • Category

    Centralised Air Conditioning

Operating 24x7 throughout the year, Goa’s Big Daddy Casino Cruise Ship presented a unique challenge—its chilled water air conditioning system had to be modified without shutting down operations. Additionally, several chilled water valves were either non-functional or could not be shut off, making direct modifications difficult. To address this, our team developed and installed a customized control system for the ship’s AHUs (Air Handling Units). This system enabled a chilled water coil bypass, allowing precise temperature control without disrupting casino activities.

Goa Medical College – Centralized HVAC Maintenance

  • Client

    Goa Medical College

  • Completed Year

    2014-2018 (with one-year extension)

  • Location

    Goa

  • Category

    HVAC Maintenance

Air Wing Engineering proudly served as the trusted partner for the operation and maintenance of the centralised air conditioning systems at the largest hospital in Goa. This engagement, spanning from 2014 to 2018, demonstrated our commitment to excellence, reliability, and customer satisfaction. Our dedication to quality was further recognized with an additional one-year contract extension, awarded due to our outstanding performance.
Scope of Work
Our responsibilities encompassed comprehensive operation and maintenance services, ensuring the uninterrupted functionality of the hospital's critical air conditioning infrastructure. Key aspects of the scope included:
1.Round-the-Clock Service:
- Ensuring 24/7 availability to address any issues promptly.
- Providing immediate solutions to maintain optimal indoor air quality and comfort for patients, staff, and visitors.
2.Preventive Maintenance:
- Conducting regular inspections and servicing to prevent potential breakdowns.
- Ensuring all equipment operated at peak efficiency and complied with industry standards.
3.Routine Maintenance:
- Performing scheduled maintenance activities to extend the lifespan of equipment.
- Addressing wear and tear, ensuring seamless operations at all times.

Nebula Home Products – Precision Air Conditioning for Bulk Box Printing

  • Client

    Nebula Home Products

  • Completed Year

    2023

  • Location

    Industrial Zone

  • Category

    Air Conditioning

This project involved designing a custom air conditioning solution for a 15-meter-long bulk box printing machine that required a strictly controlled temperature environment between 22°C and 25°C. One of the key challenges was managing the machine’s variable heat dissipation, which fluctuated significantly during operation. Our solution involved an automated HVAC control system, ensuring precise temperature regulation, energy efficiency, and uninterrupted performance tailored to the machine’s operational needs.

Zydus Life Science Limited

  • Client

    Zydus Life Science Limited

  • Completed Year

    Ongoing

  • Location

    Goa

  • Category

    Heat Exchangers

At Zydus, Air Wing Engineering successfully replaced the heat exchangers of the AHU units, improving system efficiency and overall performance.